This viaduct has a total length of 521 meters and a maximum ground clearance of around 20 meters. The two arches are located in the areas with the highest height of the viaduct and allowed the consideration of track dialating devices (ADV) at the level of the track superstructure, ensuring the longitudinal locking of the work in the face of braking actions.
